Standard with Bolted Spigot
The Standard with Bolted Spigot is the vertical member of the Ringlock scaffolding system that utilizes a removable spigot. The rosettes are placed at fixed increments of 0.5m to provide vertical support when attaching horizontal Ledgers and Diagonal Braces.
DESCRIPTION PART NO. EFF. DIMENSION (FT/M) WEIGHT (LBS/KGS)
Standard (1 Ring) Bolted Spigot 01.34.050.00 1’8″ / 0.50m 7.61/ 3.46
Standard (2 Ring) Bolted Spigot 01.34.100.00 3’3″ / 1.0m 12.67 / 5.76
Standard (3 Ring) Bolted Spigot 01.34.150.00 4’11” / 1.5m 17.77 / 8.08
Standard (4 Ring) Bolted Spigot 01.34.200.00 6’6″ / 2.0m 22.63 / 10.29
Standard (5 Ring) Bolted Spigot 01.34.250.00 8’2″ / 2.5m 27.32 / 12.42
Standard (6 Ring) Bolted Spigot 01.34.300.00 9’9″ / 3.0m 32.84/ 14.93
Standard (8 Ring) Bolted Spigot 01.34.400.00 13’1″ / 4.0m 40.32/ 18.33
Need Something?
Get In Touch
Click Here for Product Catalogs
Downloads
Share by: