TLO Bin Scaffold

Project Type:

Transport Repair


Project Location:

Western Australia


Project Summary: 

Over time the the TLO bin roof and supporting structure and been heavily corroded due to moisture in the product and needed to be replaced


Customer Challenges:

  • Building from the ground would affect the loading schedule
  • Transport and materials would have elevated costs


 

AT-PAC Solution:

  • Build cantilevered scaffold modules on the ground then craning them into position around the TLO bin, once secured the final 4 mts were added as modules.
  • Provided conceptual design to client where by we removed the need to stick build a traditional scaffold from the ground up. 


Impact:

There was a vast reduction in man hours compared with the clients original scoping projections. This translated as direct cost efficiency across the project. A short 4 hour window between trains was enough to build gantries over rail corridor allowing working at height.

 

For stage scaffolding rentals, please  contact one of our friendly consultants for more information.