TLO Bin Scaffold
Project Type:
Transport Repair
Project Location:
Western Australia
Project Summary:
Over time the the TLO bin roof and supporting structure and been heavily corroded due to moisture in the product and needed to be replaced
Customer Challenges:
- Building from the ground would affect the loading schedule
- Transport and materials would have elevated costs
AT-PAC Solution:
- Build cantilevered scaffold modules on the ground then craning them into position around the TLO bin, once secured the final 4 mts were added as modules.
- Provided conceptual design to client where by we removed the need to stick build a traditional scaffold from the ground up.
Impact:
There was a vast reduction in man hours compared with the clients original scoping projections. This translated as direct cost efficiency across the project. A short 4 hour window between trains was enough to build gantries over rail corridor allowing working at height.
For stage scaffolding rentals, please contact one of our friendly consultants for more information.