Winvic – Newhall Street


Project Type:  

Commercial / Residential


Project Location:

Birmingham, UK


Project Summary: 

AT-PAC was selected to provide Complete Scaffolding Solutions to aid in the construction of a new apartment block located the center of Birmingham, UK. The new steel frame building developments will take approximately 10 – 12 months from the erection of scaffold, use, and the eventual dismantle of the scaffold structure. Overall, the apartment block will house over 100 apartments, 6 town houses and three commercial areas at a total of 10 stories. The apartment block is estimated to be completed in August 2019.


Customer Challenges:

The apartment block was chosen to sit in a tight area between the Jewellery Quarter and the Central Business District. Due to the tight space and high-traffic area, the laydown area was limited and all around access was tight. A canal is positioned beside the apartment block allowing for even less access on that side of the block.

 

AT-PAC Solution:

  • AT-PAC’s engineering team provided strategic Engineering Design to aid in a successful and safe scaffold structure.
  • A loading platform will be erected to span the adjacent canal to ease a portion of the limited access.

 

Impact:

  • Engineering support provided quick turnarounds to enable to client to react to short lead time demands on a site that presented significant access challenges.
  • Quick delivery response time by the AT-PAC team enabled minimal wait time for necessary materials which kept the project on schedule.
  • Value added services, such as around the clock deliveries, allowed for material to be onsite at all times eliminating the limited laydown area challenge.

 

For stage scaffolding rentals, please contact one of our friendly consultants for more information.

 